Monday, July 27, 2009

Sedna-sedna-bo-bedna

(apologies to those who now have the Name Game stuck in their head)

I started my cotton cardigan with the cables and bobbles a few days ago. It's called "Sedna" and is in issue 8 of Yarn Forward magazine. I was trucking along nicely until it came to the establishing of the cable pattern when I noticed I was short a few stitches at the end. Not really worrying, I increased the few (around 3) and kept going. I ended up a few stitches too many at the end of the next row.

Uh oh.

I also noticed that the cables were a few stitches closer to the sleeve on one side then the other. This made things look a little funny because when you looked at the back of the sweater where the sleeves are, one side's cable will be nearly hidden by the armpit but the other side's cable will have plenty of room. Let's not even mention the front where one cable looked a little more crammed/scrunched than the other.

Double oops.

If anyone has done cables and/or sweaters there is an idea that sides should mirror. There is also an idea that you can't just adjust stitch numbers willy-nilly because usually those numbers are there for a reason, like something that will need those 13 stitches to fit into 7 rows down the line, or up the chart, as the case may be. This is my first cable chart project, and first serious cable project ("c5p2b", for instance), and I am praising the glory of ravelry.com for having their pattern definition information and allowing me to be a member. But even ravelry.com can not chuck me over the head and offer the suggestion that instead of barging into things, I might have planned and checked to make sure my numbers were right and marked the stitches to check for symmetry before doing it in order to not have to frog anything. Frogging cables are not fun.

I did frog it. I backtracked and checked my numbers, finding a mistake in the pattern for how many stitches my size (and all larger sizes, by the way) should have when you place the sleeve stitches on the holders. I moved on after voicing my wrath to the gods (I've taken to singing spirituals instead of cussing; it really amuses Hubby, especially when he came outside to find me cleaning chewed up bubble gum off my car floor mats and peddles after I STEPPED IN SOME FOR THE SECOND TIME IN 24 HOURS with Goo Gone, singing "Praise Jesus!") and marked the divisions where there is 2 pfb, p8, 4 pfb, p13, etc. and found that this time I only needed one extra stitch at one side and to move things over 1 stitch around one armhole.

Note to self (and any other curious persons): Use stitch markers (DON'T JUST KNIT IT) and read ahead when establishing any detailed important pattern. Keep the 2 year old out of the room when doing this or someone/thing might get hurt. Saves frogging and brain cells. And, by the way, you might want to leave the stitch markers in to save time later in the cable pattern.

Friday, July 24, 2009

If I really wanted to...

I would love to tell you tons of stuff. I'd love to write about all these socks I've decided to start and how I am slowly finishing them. They aren't all that innovative, they are for a charity event, and they are cleaning out the lessor wanted skeins from my stash so I am grateful. I'm in a down-sizing, keeping only what matters mood. Hence, there is a huge stack of odds-and-ends to take to Goodwill in a corner of Little Guy's bedroom. Will haul that away soon... I hope.

I'd love to tell you about Hubby's recovery from his shoulder surgery. Everything's fine, just needs time to let it heal, as in at least 4 weeks before even thinking about therapy. Good news for him, he gets out of doing yard work for 6 weeks, possibly rest of the yard-working season. News for me, I get to mow on Saturday mornings.

I'd love to update you about my job. There's nothing going on. Which should mean tons of knitting time but somehow that is not developing. I have to drive Hubby everywhere so that means extra outings with sprogs in tow (including getting him to work at 7:30 am... ouch) and taking care of all these little nit-piddley errands that have developed. I had to go to the DMV yesterday and sit for 40 minutes before they called me to straighten out the fact that I no longer have the lease car I traded in several months ago, etc.etc.etc. Joy of all joys. SuperGirl was sitting very patiently with me and Little Guy was asleep on my shoulder for about 20 minutes when she looked at me, sighed, and said "This is not fun at all." I agreed.

I've been eyeing some sewing projects but haven't started them. I haven't taken any pictures of anything. I have been really tired and unmotivated. The good thing is my errands seen to be waning for the moment and hopefully this weekend is relaxing and full of lovely knitting. One can always hope. I'll settle for on the boring side with a little bit of work and tons of Joan Hickson being Miss Marple. Tried to watch the newest Masterpiece Mystery Miss Marple and couldn't get past 5 minutes. Acting was crap. I'm spoiled.

Sunday, July 19, 2009

Phoebe!

She is finally here! Born Saturday, July 11, weighing 7 lbs., 10 oz. She is beautiful, her mommy is beautiful, and the world is beautiful. We are ecstatic, finding new and fun baby things to knit. I'm reminded of the Phoebe blanket (an old knitting project versus the new) that I've been avoiding but LMSS assures me that it being a 1st birthday gift is just fine.

I'm back in Shreveport, getting updates from them every day while Mom is there doing the Nana thing. We're plenty busy here. Hubby had shoulder surgery 2 days ago from where he tore a muscle diving for a softball. The shoulder had been giving him trouble for years, lots of pain depending on how much he worked out. The surgery went really well. They found some extensive damage when they went in, some of which had been there for years, so I guess it's a mixed blessing he dove for the ball and did something bad enough to it it required surgery. He's trying to recuperate and I'm keeping busy trying to keep him from being busy.

New sock knitting classes have started and I've been whirling through socks like crazy, trying to get examples for the different stages of the classes and have the socks ready for a charity event for Granny. I've also been working on the wrap I started the first trip to wait for Phoebe and have neglected the others... I'll get around to it. Someday. All I have is time, now.

Tuesday, July 7, 2009

Toesies...

Finished the second pair of socks for LMSS. Did I mention I was learning how to knit socks from the toe up? It's coming along nicely but I feel like I'm saying that a little premature; I haven't finished the toe on the first sock yet. I can already see that I'm going to need to learn the figure 8 cast on. The long-tail/pick up cast on leaves a ridge at the toe. I don't mind it for me but I would mind it if it was on a pair of socks for someone else.

Still waiting on the baby... Contemplating what other projects to finish... and not sure where to stop. I'm dangerous when I'm left at home without something official to do.

Thursday, July 2, 2009

Thursday's child has far to go

The scarf is finished, blocked, and looks lovely. I am glad to be finished with it, only because I was running out of places to sit and pay attention to the multiple row repeats.

I have been to Austin and back, but there is no baby yet. Still waiting for LMSS to call. Mom is still there and she is helping LMSS nest, i.e. organize all those hand-me-down baby clothes. Baby blanket is still for the baby's 1st birthday but LMSS has got a pair of socks with another pair I'm working on, nearly 2 nursing wraps (Mom's almost finished with the 2nd one), and she's knitting like a nut on 2 different baby outfits. They are lovely and I'm totally jealous she's the one with the little one to wear them. Well, jealous until I realize I have a 2 year old nearly fully weaned, thus my nights are almost mine, all mine. But the little dresses are SO CUTE!!!!

Little Guy sang to us every morning at LMSS's house. I'm not sure what tune it was but it sounded like a combination of the Imperial March and the ending chorus of "Hey, Jude".

I picked up some cotton yarn in Austin to carry on the wrap-knitting theme. It's 8"s long, 42"s to go. Light blue and dark blue, using a "bee stitch" which uses the "knit one below" idea. Interesting. The pattern in the book was wrong and I looked it up on Ravelry. I'll have more on that later...

I did finish both quilts at LMSS's friends house. Long arm quilting is fabulous for those projects that need to be finished and out of the "to do" pile. I still have a soft spot for hand-quilting though...

I'll try to get pictures up of everything as soon as I can. I'm no longer working at the in-laws so their computer isn't as easy to access but I'll see what I can do. Plus, any day I might get the call and go running off to Austin again. Weekend trips to Austin (5+ hours, depending on how you drive and how much you stop) will wear you out.

Thursday, June 18, 2009

Lovely waves of color...


Here is the lacy scarf I have been working on. Picture #1 is it now. Picture #2 is what it was a few weeks ago and I was bored to tears. The pattern was nice and interesting but the mercerized cotton was too stiff and non-elastic to carry the give and take it needed to make the holes and waves. I knew I wanted to make a lacey scarf but didn't know what pattern to do it in. Picked up the latest "Yarn Forward" magazine and bam! there it was, near the back. Picture #1 is coming along nicely. It's wanting to curl on me so adventures in blocking is a must (note to self: must get mesh drying rack; still haven't washed that other sweater either and need this badly now!) but I'm finding I might like lace. It has enough changes to keep the attention and it's lots of fun to see the pattern emerge and see why there are so many yos, ssks, sl2k1pssos, k2togs, etc. and how they shape and move the lines in the yarn. I do not recommend knitting lace during a car trip. Tried that a few weekends ago and somehow dropped several stitches, which can be detrimental when knitting lace. I had to put it away before I was tempted to panic and throw the whole thing out the window.

I was reminded that I need to be working on AAnt's afghan; his birthday is in a few weeks. Must do. Cross-stitch birthday gift is being changed to cross-stitch Christmas gift, unless I get on a serious cross-stitch kick, something I seriously doubt. Hunky Hubby's sweater is coming along slowly but is so soft and so nice to zone out and knit. LMSS's baby blanket has been pushed to being a 1st birthday present. So I have little over a year... I think I can get up the courage in that time. How come I can knit sweaters and not bat an eye but a baby blanket is freaking me out? Must over-analyze...

LMSS also informed me that she has time saved up for her friend's long-arm quilting machine so when we are there on baby watch in another week or two we can go there and finish up whatever quilts we need to do. Very tempting. I still have a quilt to quilt (pinned together and waiting for me in a bag), SuperGirl's quilt to layer, pin, and quilt (was given to me pieced, thank goodness and I have all the materials, just haven't put it together yet), and my first quilt I started but haven't gone anywhere with it yet. It's cut out but I have yet to start sewing. I think a king-sized quilt was a huge thing to take on but I'm still going to do it. Until now, I've only done 9-patch and patchwork quilting, no actual quilt blocks, and I need to make that bridge even if it's to finish it and say "look what I did!" and never make another again. I have a feeling the cross-stitch will be a project like that too...

SOCKS!

I had to post these, even though they are a gift for LMSS. I had the best time with this yarn. It was discount priced at Michael's ($1 a skein!!! Caution or throw it to the wind? Hmmm...) I wasn't sure how it would knit or turn out, but I'm so easily amused the color changes kept me greatly entertained; the colors knitted look TOTALLY different from the way they looked on the skein. The yarn itself makes me suspect that it might felt a little if thrown in the dryer so no dryer. I don't know anyone who throws hand-knitted socks in the dryer anyway, except maybe me when I'm not paying attention. On the pattern, I adjusted how many stitches to decrease to on the toe: I did 16 total (so the stitch count was 4, 8, 4 on the double points) instead of the 8 the pattern called for (2, 4, 2). I suspect the pattern called to go down that far so the knitter didn't have to practice the Kitchener Stitch for very long. I don't mind the Kitchener Stitch and I like a wider, less pointy toe, so this worked out nicely.

I had told LMSS about the color combination and how it wasn't our usual RED!/YELLOW!/ORANGE! choices for socks. I had hoped it would be ok and she said it was because she needed some more socially acceptable hand-knit socks. These are mostly socially acceptable; notice I did rebel slightly and not match the stripes. :) Such a wild life I have...